Monitor system has been installed

RA239 monitor system has been installed in a recording studio (Zhovty Vody, Dnipropetrovsk, Ukraine), so construction of the studio has been finished. Acoustic design - Alexander Kravchenko. Engineering and technology - Valery Beskorsy. Installing and adjustment of monitor system - Oleg Naumenko and Alexander Kravchenko. The owner of the studio - Meshcheryakov George. The studio has control room and neutral acoustic room for recording.

Studio in Almaty

Currently the pre-project work is running on the construction of recording studio near Almaty, Kazahstan. Studio will live in a separate 1-floor building with ceiling height of 4.5 meters. Studio is planned to have a control room of 35 sq. meters area, recording room with neutral acoustics (area = 40 sq. m) and vocal room (area = 16 sq. m). Reflexion Arts 239 high definition monitor system will be installed as main monitoring solution.

We are 10 Years Young!

Our company is 10 years old (young) now. It is common to accept congratulations and make gifts on such an occasion. So we are announcing a "Three projects for half a price" campain. The rebate is actual till 15 of July 2010 on the territory of Ukraine. The rebate conditions: a) the building for the studio should meet minimum requirements for studion construction b) a monitor system RA 239 or RA 234 should be bought and installed. First three requests will be treated as winners onc...

About Sound Consulting

For several years we deliberately put off the creation of this web-site for one simple reason: our customers can't be people who have decided - without getting up from the sofa - to find a designer for their studio or sound system. To find us, it was necessary to read at least a certain number of articles and books, and accompanied by more and more into the realm of Sound. But the appearance of this website is not an indication of change in our position. Thus, there will not be a forum, becau...

What does your company apart from designing recording studios?

The answer to this question is incorporated in the name of our company. Design and construction of recording studios - one of our activities. In addition, we design and set up sound systems and do all the things that require a balanced and competent approach: design sound systems for sport, entertainment and shopping complexes, for cinema and home theatres, tours, etc. We are not tied to any brand, so in each case we offer our customers the complete set of equipment that best suits to their task...

Why do you refuse to build on a turnkey basis? What are the causes?

Because it is disadvantageous especially for you! I'll try to explain in order. Construction on a turnkey basis means that the project engineer, engineer for switching, electrical engineer, fitter, foreman, supplier and 4-6 builders are involved in construction of your studio - that is about 11-13 people. And if we add more experts on ventilation/air conditioning, security alarm, fire treatment, etc., the number could grow to 15-20 people. If the studio is built far off, all of them need some...

How to choose a designer to build the studio?

Acoustic design is an activity which is at the intersection of science and creativity, and more precisely creativity. It is always a work of authorship, and no company can do so, as some acoustic desigber can do . Take a look at our portfolio and note that each built our studio has given the project's author, who is personally responsible for its implementation. And it is correct. Compare, for example, the sound of violins made by a talented craftsman (Stradivarius, for example) with the sound o...